Well Completion Engineering Experimental Teaching Platform

Well Completion Engineering Experimental Teaching Platform


Implement experimental teaching and scientific research on sand control mechanisms and sand control tool blockage mechanisms; conduct experimental teaching on dynamic simulation and measurement of oil, gas, and water inflow under different water control methods; also undertake scientific tasks related to the design and optimization of new water control tools to a certain extent; comprehensive experimental teaching platform for sand control simulation; experimental teaching platform for water control completion.
Contact Us


--------

Convenient and easy to use

 

Graphical user interface

Easy and understandable operation


--------

Reliable and stable

 

High accuracy, high stability

 

 


--------

Personalized customization

 

Can be customized according to needs

Enhance device configuration

     

Application Fields

 

 

Application Functions

Product Parameters

Parameter index

Pressure range 0~5MPa
Fluid medium Water, oil, silt (20~200 mesh)
Flow range 0~62L/min
The inner diameter of the simulated wellbore is 220mm, the inlet is PC cast pipe, the effective total experimental length is 7m, and the simulated inclination angle is 0~90°
The base pipe size of the sand control screen is 5~1/2″, the sand control jacket is 7″, and the experimental screen pipe string can realize segmented packer in the simulated wellbore
Mixed injection of oil and water in different proportions can be realized
The water control screen pipe string can realize segmented packer and segmented injection of fluids with different properties (including flow rate, pressure and viscosity) in the simulated wellbore

Scan

Tuochuang Technology WeChat Subscription Account

Scan

Tuochuang Technology Official Douyin Account

Jiangsu Tuochuang Scientific Instrument Co., Ltd.

Copyright © 2023 Jiangsu Tuochuang Scientific Instrument Co., Ltd.